(Flex)pool: the trigger?
a study to reduce manpower by synchronizing the short-term production schedules of P1L, P1P and P2P, three production plants of Fuji Photo Film BV in Tilburg

  • J.W. Verhoeven

Student thesis: Master

Abstract

Date of Award31 Mar 2005
Original languageEnglish
SupervisorJ. Wubben (Supervisor 1)

Cite this

'